ZEMCH 2012 International Conference Proceedings - page 403

+ H Y T T E . a V e r s a t i l e C o n s t r u c t i o n S y s t e m
393
9
JUN
1471
1476
56
1406
11
0
2152
2196
2202
JUL
1497
1525
57
1470
11
3
2191
2256
2280
AUG
1161
1241
46
1220
92
1699
1810
1885
SEP
691
777
29
781
58
1011
1138
1239
OCT
328
374
14
385
28
480
568
644
NOV
133
170
7
190
13
195
271
341
DEC
71
108
4
134
8
104
182
257
Total
8745
9736
10004
12798
13903
14732
fromMAY
to NOV
6672
6990
6829
9763
10306
10651
* PV triangular extra element placed in the roof (east and west facades).
+
- Photovoltaic panels integrated in
the roof slabs.
- Coherent with the concept.
- House is extendable with further
modules.
- Extra PV integrated element
- No shading.
- Larger area and power.
-
- Affected by snow and shading.
- PV system independent from roof
construction and incoherent with
the plan.
- More difficult integration with the
components
- Built on site.
In addition to the calculations performed inside PVSyst it has been considered that
shading losses of the system will be affected by the disposal of the panels on the roof
(where a partial shading of part of a panel will result into a reduced energy production of
the entire panel, thus a higher loss). Results of this final calculation have been collected
in table 6, together with the use of an array of PV modules integrated in the south façade.
Table 6: Final model and produced energy (PVSyst)
Pv
production
Final model.
South façade
PV
JAN
50
209
FEB
88
454
MAR
141
932
APR
149
1316
MAY
186
2004
JUN
154
1792
JUL
165
1874
AUG
162
1576
SEP
139
1042
OCT
90
534
NOV
65
282
DEC
62
212
Total
1451
12227
1...,393,394,395,396,397,398,399,400,401,402 404,405,406,407,408,409,410,411,412,413,...788